£46m upgrade plan: Castlerock semaphores signal final train

by

NOVEMBER 2 marked the end of an era for Northern Ireland Railways (NIR) when at 21.00 the signal cabins at Derry/Londonderry and Castlerock were switched out for the last time.

NIR driver Paul Thompson and signalman Kevin Brown exchange tokens at Castlerock, making the last train movement prior to the closure of the signal cabin on November 2. CHRIS PLAYFAIR

The switch off is part of a £46million signalling upgrade, with the line in future being controlled from a new signalling centre within the station building at Coleraine.

The centre was due to come on line in November 2016 following an 18-day closure of the line between Coleraine and Derry/Londonderry.

Article continues below…
Advert

Monthly Subscription: Enjoy more Railway Magazine reading each month with free delivery to you door, and access to over 100 years in the archive, all for just £5.35 per month.
Click here to subscribe & save

The closure of Castlerock was particularly significant, it being the last lever-framed operational ’box on the NIR network.

The Babcock International Group has been commissioned to complete the upgrade work, including the removal of the Castlerock passing loop, which will be replaced by the new loop at Bellarena.

Read more in the December issue of The RM

Article continues below…
Advert


Advert
Subscribe to The Railway Magazine
Enjoy more of The Railway Magazine reading every month. Click here to subscribe.

Railway Reads

From the history of steam through to 21st century rail transport news, we have titles that cater for all rail enthusiasts. Covering diesels, modelling, steam and modern railways, check out our range of magazines and fantastic subscription offers.


Article Tags:

About the Author