ARGENTINA president Mauricio Macri officially opened the second new elevated commuter railway in Buenos Aires on July 10.
It has replaced ground-level railways with new routes on viaducts, eliminating 11 level crossings, and releasing some land for redevelopment.
Monthly Subscription: Enjoy more Railway Magazine reading each month with free delivery to you door, and access to over 100 years in the archive, all for just £5.35 per month.
Click here to subscribe & save
The 5km section of the Linea San Martin line between and Palermo and La Paternal in the city’s suburbs has been rebuilt on an eight-metre high viaduct comprising 780 prefabricated concrete sections, incorporating more than 25,000 tonnes of steel.
Two 220-tonne machines were used to move each concrete section horizontally into place. The work cost 3.1billion Pesos (£60million).
Read more in the August 2019 issue of The RM – on sale now!