NEWHAVEN Harbour signalbox is one of three due to close at the end of November as part of the resignalling of the Lewes to Seaford branch (the others being Newhaven Town and Lewes ‘B’).
New signalling has been installed and will be commissioned during a four-day line closure, with trains due to resume on December 2.
Monthly Subscription: Enjoy more Railway Magazine reading each month with free delivery to you door, and access to over 100 years in the archive, all for just £5.35 per month.
Click here to subscribe & save
Southern Class 313/2 No. 313212 passes the 1886-built signalbox with the 15.53 Seaford-Brighton on September 9 as the MS Côte D’Albâtre stands in dock after arrival from Dieppe. GORDON EDGAR
Read more News and Features in the November 2019 issue of The Railway Magazine –on sale now!